Living Areas

Becker Home Improvement will create a new basement space for you. Randy will work with you to design and build a new basement area.

Becker Home Improvement is committed to creating a new basement recreation room. An kitchen or bathroom project begins by defining a budget, construction plans, and a contract. Details of these steps are found on the Beginning Your Project page. Once the steps are complete, the construction will begin. Randy and the Becker Home Improvement team work with you on each phase of the process.

Framing Phase

The framing phase for your project begins with demolition if needed. New interior framing will be constructed. The rough electrical, plumbing, and heating, ventilation, and air conditioning (HVAC) is installed. The framing phase ends with the rough inspection by the building inspector.

Insulation Phase

Interior insulation and vapor barrier is installed if needed for your project. The insulation and vapor barrier are inspected by the building inspector.

Interior Build Phase

The interior build phase begins with drywall followed by painting and flooring. Flooring and accent, plumbing, and electrical trims are installed. The interior build phase is completed with the final building inspection.

Living Areas Gallery

Basements Gallery